How Long Does Concrete Take To Cure

0
43
This article focuses on the setting time of concrete and mainly introduces several factors that affect it, with the following specific contents:

Differences in cement varieties

The hydration characteristics of different types of cement directly determine the setting time of concrete.

 

  • Ordinary Portland cement has high activity of mineral components, with the initial setting time usually controlled within 45 minutes and the final setting time not exceeding 10 hours, which is suitable for conventional construction scenarios.
  • For admixture cements such as slag Portland cement and pozzolanic Portland cement, due to the long cycle of the secondary hydration reaction, their final setting time can be extended to 12-15 hours.
  • The type of cement should be selected according to the project progress requirements.

Water-cement ratio balance control

As a core ratio parameter, the water-cement ratio needs to take into account both fluidity and strength development.

 

  • When the water-cement ratio exceeds 0.6, excess water forms capillary pores during the hardening stage, which not only prolongs the final setting time but also reduces the 28-day compressive strength by 15%-20%.
  • If the water-cement ratio is lower than 0.4, the slump of the concrete mixture is insufficient, which can easily lead to poor vibration and hinder the local hydration reaction.
  • In actual projects, the water-cement ratio of pumped concrete is mostly controlled in the range of 0.45-0.55, and water reducers are used to optimize working performance.

Dynamic response of ambient temperature

Temperature has an exponential effect on the hydration reaction rate.

 

  • Experimental data show that for every 10°C increase in ambient temperature, the cement hydration rate increases by 2-3 times, and the initial setting time can be shortened by 30%-50%.
  • When the temperature is lower than 5°C, winter construction plans need to be initiated, and steam curing or electric heating measures should be adopted to keep the internal temperature of the concrete above 10°C.
  • During high-temperature construction in summer, crushed stone aggregates need to be pre-cooled in the mixing water to control the concrete mold temperature not to exceed 30°C.

Adaptation of admixture functions

Chemical admixtures optimize construction by regulating the hydration process.

 

  • Retarders (such as lignosulfonate) can extend the final setting time to more than 20 hours, which is suitable for layered pouring of mass concrete.
  • Early strength agents (such as triethanolamine composite systems) can increase the strength by 40%-60% in 3 days, and are often used in emergency repair projects or prestressing.
  • Attention should be paid to the compatibility test of admixtures and cement to avoid abnormal phenomena such as rapid setting or excessive retarding.
Gesponsert
Suche
Gesponsert
Kategorien
Mehr lesen
Spiele
KINGBET188 Link Login Judi Main Slot Anti Rugi Pasti Terbuka Resmi
KINGBET188 Link Login Judi Main Slot Anti Rugi Pasti Terbuka Resmi KINGBET188 Situs Judi Online...
Von KINGBET188 HOKI 2025-06-25 23:24:30 0 280
Andere
USA Passport Application: I lost my passport and I fly tomorrow What do I do?
USA Passport Application: Imagine this, you have an aircraft scheduled for the day after...
Von USA Passport Application 2025-06-26 08:39:21 0 261
Andere
Top 5 Job-Oriented Courses with Placement Guarantee
Introduction Nowadays, merely holding a degree is insufficient. Most students are jobless even...
Von Shakti Nath 2025-07-09 15:34:34 0 84
Andere
Control System Integration: Powering Intelligent Industrial Automation
Control system integration is the cornerstone of modern industrial automation. It brings together...
Von Automation SEO 2025-06-29 11:00:54 0 240
Andere
Delhi to Shimla Cab
Book Delhi to Shimla cab online at best price. CabBazar provides car rental services for all cab...
Von Cab Bazar 2025-07-12 07:58:05 0 9